top of page

Institutional/Infrastructures

Facilities Booster Station Phase 1 - Water Infrastructure Upgrade, Sampson Cree Nation, Alberta (May 2022)

HINGENEERING Consulting is proud to be the structural engineer for the Facilities Booster Station Phase 1, Water Infrastructure Upgrade in Samson Cree Nation, Alberta. The main consultant is Urban Systems for the process, mechanical and electrical engineering design. HINGENEERING is the structural engineer and City Architecture was the project architect. The pump station is 63 square meters.

Structural Design for Mooring System for Monitoring Boat at Site C Dam, Fort St. John, British Columbia (April 2020)

HINGENEERING Consulting had been invited by ProRescue Service to provide structural design for mooring system of a monitoring boat to be used downstream of the diverted channel during the construction of Site C dam in Fort St. John, British Columbia. The design included the cable load evaluations and the pile foundations on shore. 

Structural Design for Trench Shoring Excavation at Campell Road and Anthony Henday, Edmonton, Alberta (October 2019)

HINGENEERING Consulting had been invited by ProRescue Service to provide structural design for shoring of an open excavation serving new bus terminal at Campell Road south of the Anthony Henday in Edmonton, AB. The design included the structural configuration of horizontal and vertical spacing of proshore struts. The depth of the trench ranged between 9 to 13 feet. 

Structural Inspection of Rossdale Water Treatment Plant, Edmonton, Alberta (Dec, 2018)

HINGENEERING Consulting had been invited by ProRescue Service to assess the structural conditions of the existing drain valve chambers connected to Clarifiers 2-1 and 2-2 at Rossdale Water Treatment Plant, operated by EPCOR, in Edmonton, AB. The main scope of this inspection report is to assess the structural integrity of the concrete structure of the nine drain valve chambers

Facilities Booster Station Phase 1 - Water Infrastructure Upgrade, Sampson Cree Nation, Alberta (May 2022)

HINGENEERING Consulting is proud to be the structural engineer for the Facilities Booster Station Phase 1, Water Infrastructure Upgrade in Samson Cree Nation, Alberta. The main consultant is Urban Systems for the process, mechanical and electrical engineering design. HINGENEERING is the structural engineer and City Architecture was the project architect. The pump station is 63 square meters.

Structural Design for Mooring System for Monitoring Boat at Site C Dam, Fort St. John, British Columbia (April 2020)